Our Projects

Lindapter products provide a faster, cost-effective alternative to on-site drilling or welding and are designed to reduce installation time and labour costs. A high strength, permanent (or temporary) connection is quickly achieved by clamping two steel sections together.

Westfield Centrepoint Sydney - Hollo Bolts & Fixings for Railings, Steelworks & Floors - CBW Engineering

Westfield Centrepoint Sydney

Location: Sydney, AustraliaProduct: Hollo-Bolt Countersunk M12 and M16 (HCF)Application: Hollow section roof frame connections Approximately 4,000 Countersunk (Bolt Head) Hollo-Bolts were used in the recent

LEARN MORE >>
Caulfield to Dandenong Project - Hollo Bolts & Fixings for Railings, Steelworks & Floors - CBW Engineering

Level Crossing Removal

Road/Rail from Caulfield to Dandenong A 15km Sky Rail was erected to replace five Level Crossings. Over 50,000 Lindapter Floorfast clips were used to secure

LEARN MORE >>
Olympic Stadium - Hollo Bolts & Fixings for Railings, Steelworks & Floors - CBW Engineering

Sydney Olympic Stadium

The Lindapter Hollo-Bolt steel cavity fixing has further demonstrated its capabilities in exacting applications at the prestigious Stadium Australia project.

LEARN MORE >>
Eureka - Hollo Bolts & Fixings for Railings, Steelworks & Floors - CBW Engineering

Eureka Tower

Lindapter Hollo-Bolts have been used to fix a swarm of giant golden bees to one of Australia’s tallest residential buildings.

LEARN MORE >>
North south bypass channel - Hollo Bolts & Fixings for Railings, Steelworks & Floors - CBW Engineering

North South Bypass Tunnel

Lindapter steelwork clamps are simplifying the construction of the on/off ramps needed for the Brisbane North South Bypass Tunnel project. When completed, this 6.8 km long construction will be the longest tunnel in Australia.

LEARN MORE >>