Our Projects
Lindapter products provide a faster, cost-effective alternative to on-site drilling or welding and are designed to reduce installation time and labour costs. A high strength, permanent (or temporary) connection is quickly achieved by clamping two steel sections together.
![Projects - Projects Westfield Centrepoint Sydney - Hollo Bolts & Fixings for Railings, Steelworks & Floors - CBW Engineering](https://www.lindapterdistributor.com.au/wp-content/uploads/2020/11/westfield-sydney.jpg)
Westfield Centrepoint Sydney
Location: Sydney, AustraliaProduct: Hollo-Bolt Countersunk M12 and M16 (HCF)Application: Hollow section roof frame connections Approximately 4,000 Countersunk (Bolt Head) Hollo-Bolts were used in the recent
![Projects - Projects Caulfield to Dandenong Project - Hollo Bolts & Fixings for Railings, Steelworks & Floors - CBW Engineering](https://www.lindapterdistributor.com.au/wp-content/uploads/2020/11/Caulfield-to-Dandenong-Project-Feature.jpg)
Level Crossing Removal
Road/Rail from Caulfield to Dandenong A 15km Sky Rail was erected to replace five Level Crossings. Over 50,000 Lindapter Floorfast clips were used to secure
![Projects - Projects Olympic Stadium - Hollo Bolts & Fixings for Railings, Steelworks & Floors - CBW Engineering](https://www.lindapterdistributor.com.au/wp-content/uploads/2020/11/Olympic-Stadium.jpg)
Sydney Olympic Stadium
The Lindapter Hollo-Bolt steel cavity fixing has further demonstrated its capabilities in exacting applications at the prestigious Stadium Australia project.
![Projects - Projects Eureka - Hollo Bolts & Fixings for Railings, Steelworks & Floors - CBW Engineering](https://www.lindapterdistributor.com.au/wp-content/uploads/2020/11/Eureka.jpg)
Eureka Tower
Lindapter Hollo-Bolts have been used to fix a swarm of giant golden bees to one of Australia’s tallest residential buildings.
![Projects - Projects North south bypass channel - Hollo Bolts & Fixings for Railings, Steelworks & Floors - CBW Engineering](https://www.lindapterdistributor.com.au/wp-content/uploads/2020/11/north-south-bypass-channel.jpg)
North South Bypass Tunnel
Lindapter steelwork clamps are simplifying the construction of the on/off ramps needed for the Brisbane North South Bypass Tunnel project. When completed, this 6.8 km long construction will be the longest tunnel in Australia.